The Fresh Air Fund gets a new heavy timber dining hall @ Camp Hayden. Douglas fir timber trusses with steel joinery.
Vermont Timber Works also worked on Camp ABC and built some timber cabins. Repeat business is the best compliment.
Tuesday, June 2, 2009
Camp Hayden Dining Hall Timber Trusses
Posted by Sandy at 11:31 AM 0 comments
Wednesday, April 22, 2009
Douglas Fir Timber Trusses
Vermont Timber Works is proud to share with you our latest timber frame commercial project. MANY heavy timber trusses create the new Camp Hayden Dining Hall for the Fresh Air Fund.
Impressive! Peeled poles, traditional joinery and steel joinery and LOTS of design coordination. Team members include...Vermont Timber Works (of course), The Geddis Partnership, Cuoco Engineering and Storm King Contracting.
Thank you Fresh Air Fund and The Sharpe Reservation, we are very happy with this latest timber frame creation.
Posted by Sandy at 2:38 PM 3 comments
Labels: commercial timber truss, Douglas Fir Timber Truss, heavy timber trusses
Thursday, May 29, 2008
The Katonah Memorial Bathhouse TRUSSES are in!
Another beautifully done commercial timber frame project to share with all of you. The Katonah Memorial Bathhouse Timber Trusses are in and the finish work looks to be just about complete. Location is Bedford, NY.
Vermont Timber Works, coordinating with George Rosamond of Lothrop Associates Architects and Peter Camilli & Sons brought this building back to life. The beautiful douglas fir timbers and turned columns carry an FSC Certification (because forests matter).
Posted by Sandy at 9:53 AM 0 comments
Labels: commercial timber truss, Douglas Fir Timber Truss, King Post Truss, Turned Columns
Friday, April 25, 2008
Double Chorded Scissor Truss in Douglas Fir.
Double Chorded Scissor Truss in Douglas Fir Timbers spanning 60 Feet. Now that is impressive!
The Executive Center project (shown above) needed a steel super structure to support our scissor truss. Vermont Timber Works custom designs, engineers and hand crafts each timber frame project. So, if you happen to need a double chorded scissor truss that spans 60 feet, we can deliver.
Posted by Sandy at 3:15 PM 2 comments
Labels: commercial timber truss, double chorded scissor truss, Douglas Fir Timber Truss